New offshore Off-Load 16” and 24” distillates and fuel oil and two 10” LPG pipelines. Includes Multi-Buoy Mooring (MBM) and Pipeline End Manifold (PLEM) to onshore Costal Valves Stations (CVS)

Preparing the engineering Corrosion Protection Basis of Design (BOD)

Client: Israel Ports – Development and Assets Company Ltd (IPC)

Year: 2024