N. Eliav Infrastructure and Corrosion Engineering Ltd is at the forefront of technology and offers its customers solutions at TK level include the entire value chain required for corrosion prevention and cathodic protection – characterization of needs, engineering design, supervision, procurement and supply of equipment, construction, operation and maintenance.
N. Eliav Infrastructure and Corrosion Engineering Ltd is at the forefront of technology and offers its customers solutions at TK level include the entire value chain required for corrosion prevention and cathodic protection – characterization of needs, engineering design, supervision, procurement and supply of equipment, construction, operation and maintenance.
N. Eliav Infrastructure and Corrosion Engineering Ltd was established in early 2017. The company’s founder is Mr. Noam Eliav with more than 25 years of professional experience with corrosion prevention and cathodic protection.
N. Eliav Infrastructure and Corrosion Engineering Ltd is one of the largest, most stable and valued companies engaged with corrosion prevention and cathodic protection for infrastructure in the eastern Mediterranean
Our experienced engineers provide services from design through to commissioning and ongoing operation, repairing CP systems and CP systems fault investigation.
Our engineering services within CP design include:
We provide a full package of project engineering technical support through various activities including:
Cathodic Protection Material Supply
Coating Supply
CP Design
Pipeline lenght: 40 Km
Client: INGL
Year: 2020
CP Coordination activities, Supervision, Commissioning and Acceptance Tests
Pipeline Length: 25 Km
Client: Noble Energy Inc.
Year: 2019
Project Management and Tecnical Supervision of anode-bed installation and CP arrangements for pipeline under highway
Client: INGL
Yaer: 2020
CP Supervision
Pipeline Lengh: 17 Km
Client: INGL
Year: 2018
CP Design
Pipeline Length: 11.5 Km
Client: Petroleum & Energy Infrastructures Ltd (PEI)
Year: 2020
CP Design
Pipeline Length: 1.2 Km
Engineering Contractor: TechnipFMC plus TMNG
Year: 2020
Client: Energean Oil&Gas
CP Supervision
Pipeline Length: 9.5 Km
Year: 2019
Client: INGL
CP Design
Pipeline Length: 0.78 Km
Client: Palestine Power Generation Co.
Year: 2019
CP Design for internal super duplex piping
Engineering Contractor: IDE
Client: Formosa Petrochemical Corporation (FPCC)
Year: 2019
CP Design for three firewater pump caissons
Engineering Contractor: Wood Group – Mustang
Client: Noble Energy Inc.
Year: 2018
CP project Management
Pipeline Length: 92 Km
Client: INGL
Year: 2018
CP Design plus Design restrain systems to reduce the effects of short cut from nearby HV pilons 161 KV
Pipeline Length: 18.3 Km
Final Client: INGL
Year: 2018
MVC Desalination Unit Corrosion Assessment and Material Review
Engineering Contractor: IDE
Mount Holland Lithium Mine, Kwinana, Western Australia
Year: 2019
CP Design & Analysis Data for Intake Pump Stations
Engineering Contractor: IDE
Clint: Santa Barbara Municipally
Yaer: 2018
CP Design
Pipelines Length: 84.5 Km + 84.5 km
Client: Petroleum & Energy Infrastructures Ltd (PEI)
Year: 2020
Preparing the engineering Corrosion Protection Basis of Design (BOD)
Client: Israel Ports – Development and Assets Company Ltd (IPC)
Year: 2024
Complete engineering design for Corrosion Protection and Cathodic Protection
Pipeline Details: Dia. 36″, Length 33.1 km
Client: Israel Natural Gas Lines Ltd
Year: 2026
Ongoing maintenance, including periodic measurements
Pipelines Details: Dia. from 2″ to 18″, in various lengths.
Client: Merimon Natural Gas North Ltd
We are here to answer all your questions, please leave detailed message and we will get back to you soon.